Seleksi Sub-Kontraktor Proyek Konstruksi Jalan Layang

Hery Muhendra, Sawarni Hasibuan

Abstract


The aim of the study is to measure the selection criteria of sub-contractor fly over construction project and to level the sub-contractors based on five criteria which are financial factor, practical factor, managerial, safety, and company’s image. The right sub-contractor as partner is the important factor for main contractor in building the fly over based on the schedule and the budget with good quality. The study was using ANP (analytic network process) to evaluate the criteria interrelation of main contractor when making decisions of uncertainty situation to be better. The subject of the study is the Tendean-Blok M-Cileduk fly over construction project. The result shows that sub-contractor A has the highest result of 0.4798, sub-contractor B with 0.3646 and the last is sub-contractor C with 0.1556.


Keywords


fly over; sub-contractor selection; ANP

Full Text:

PDF

References


Badan Pusat Statistik. (2017). Indikator Konstruksi Triwulan II. Jakarta: Badan Pusat Statistik.

Budiarti, S., & Widodo, A. (2013). Pengambilan keputusan multi-kriteria menggunakan metode ANP (Analytical Network Process) pada evaluasi supplier. Jurnal Mahasiswa Matematika, 1(4),288-291.

Elanchezhian, C., Ramnath, B. V., & Kesavan, R. (2010). Vendor evaluation using multi criteria decision making technique. International Journal of Computer Applications, 5(9), 4-9.

Ervianto, W. (2002). Manajemen Proyek Konstruksi. Yogyakarta: Andi Offset.

Fuady, M. (1998). Kontrak Pemborongan Mega Proyek. Bandung: Citra Aditya Bakti.

Henrico, &Soekiman, A. (2013). Analisa perilaku kontraktor utama dalam melakukan subkontrak kontruksi bangunan gedung di Indonesia. Jurnal Konstruksia,5(1), 33-48.

Ho, W., Xu, X., & Dey, P.K. (2010). Multi-criteria decision making approaches for supplier evaluation and selection: A literature review. European Journal of Operational Research, 202(1), 16-24. doi:10.1016/j.ejor.2009.05.009

Iriani, Y.,& Herawan, T. (2012). Pemilihan supplier bahan baku benang dengan menggunakan metode analytic network process (ANP) (Studi kasus home industry nedy). Simposium Nasional RAPI XI FT UMS – 2012. Solo.

Kementerian Pekerjaan Umum Republik Indonesia. (2007). Peraturan Menteri Pekerjaan Umum Nomor 43/ PRT/ M/ 2007 tentang Standar dan Pedoman Pengadaan Jasa Konstruksi. Diakses dari http://birohukum.pu.go.id/uploads/DPU/2007/Permen43-2007.pdf 1 Januari 2017

Kurniawan, R., Hasibuan, S., & Nugroho, R.E. (2017). Analisis kriteria dan proses seleksi kontraktor chemical sektor hulu migas: Aplikasi metode Delphi – AHP. Jurnal Ilmiah Manajemen, 7(2), 252-266.

Lavelle, D., Hendry, J., & Steel, G. (2007). The selection of subcontractors: Is price the major factor? Proceedings of the 23rd Annual Association of Researchers in Construction Management (ARCOM), 65-73.

Lin, R., Lin, J.J., Shu, C.J., Diodes, T., Chao, H., Peter, J.C. (2008). Note on group consistency in analytic hierarchy process. European Journal of Operational Research, 190(3), 627–678.

Messah, Y. A., Pono, R.D.R., & Krisnayanti, D.S. (2012). Kajian kriteria pemilihan subkontraktor oleh kontraktor utama menggunakan metode analytic hierarchy process (AHP) [The study of selecting the subcontractor criteria by the main contractors using analytic hierarchy process (AHP)]. Dinamika Teknik Sipil, 12(1), 94-100.

Presiden Republik Indonesia. (2010). Peraturan Presiden Republik Indonesia Nomor 54 Tahun 2010 tentang Pengadaan Barang/ Jasa Pemerintah. Diakses dari www.bpkp.go.id/uu/filedownload/5/4/1853.bpkp 1 Januari 2017

Saaty, T. L. (2005). Theory and applications of the analytic network process. Pittsburgh, PA: RWS.

Saaty, T. L. (2008).Decision making with the analytic hierarchy process.International Journal of Services Sciences, 1(1), 83-98.

Shiau, Y-C., Tsai, T-P., Wang, W-C., & Huang, M-L.(2002). Use questionnaire and AHP techniques to develop subcontractor selection system. Proceedings of the 19th International Symposium on Automation and Robotics in Construction (ISARC), 35-40. doi: 10.22260/ISARC2002/0006

Shemshadi, A., Toreihi, M., Shirazi, H., & Tarokh, M. J. (2011). Supplier selection based on supplier risk: An ANP and fuzzy TOPSIS approach. The Journal of Mathematics and Computer Science, 2(1), 111-121.

Shemshadi, A., Shirazi, H., Toreihi, M., & Tarokh, M.J. (2011). A fuzzy VIKOR method for supplier selection based on entropy measure for objective weighting. Expert Systems with Applications, 38(10), 12160-12167.

Tahriri, F., Osman, M. R., Ali, A., Yusuff, R. M., & Esfandiary, A. (2008). AHP approach for supplier evaluation and selection in a steel manufacturing company. Journal of Industrial Engineering and Management, 1(2), 54-76. doi:10.3926/jiem.2008.v1n2.p54-76

Wu, T., Shunk, D., Blackhurst, J., & Appalla, R. (2007). AIDEA: A methodology for supplier evaluation and selection in a supplier-based manufacturing environment. International Journal of Technology and Management, 11(2), 174-192.

Yulianti, M. (2013). Penerapan metode analytic network process (ANP) dan technique for order preference by similarity to ideal solution (TOPSIS) dalam pemilihan supplier (Studi kasus PT Industri Telekomunikasi Indonesia, Bandung) (Skripsi tidak terpublikasi). Universitas Pendidikan Indonesia, Bandung, Indonesia.




DOI: http://dx.doi.org/10.25292/j.mtl.v5i1.213

Refbacks

  • There are currently no refbacks.


Copyright (c) 2018 JURNAL MANAJEMEN TRANSPORTASI & LOGISTIK

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

JURNAL MANAJEMEN TRANSPORTASI & LOGISTIK

(ONLINE eISSN 2442-3149 | PRINT pISSN 2355-472X)

 Creative Commons Licence
Jurnal Manajemen Transportasi & Logistik is licensed under a  Creative Commons Attribution-NonCommercial 4.0 International License.

View My Stats